Project Type: New
Construction Cost: $37M
Size: 175,000 SF New
45,000 SF Reno
Performing Arts
Silver Lake Regional High School
Kingston, MA
DRA provided theater planning and design services for two theaters in this regional school district. Each of these construction efforts were undertaken within an occupied school site throughout the duration of the phased construction. The High School theater (pictured above) is a 750-seat facility featuring caliper arm stages and fly with technical grid. DRA also designed the Silverlake Regional Middle School which included a 350-seat theater facility with venue.